The most recent attempt was so close. As usual, got wrecked by the final tool change. Not sure what happened (maybe I just forgot to touch off?), but the final tool, which finished the linear guide grooves, was about 1mm too deep.
This op is 1/6 of the whole part. Eventually 3 of these, machined on both sides, will get joined by a tie rod.
3mm drill shank in the 3mm slot. The walls are actually parallel now.
Face spline for locating the 3 pieces and transmitting torque:
So exiting. Love the nice connection design!
ReplyDelete